1887
banner image
No data available.
Please log in to see this content.
You have no subscription access to this content.
No metrics data to plot.
The attempt to load metrics for this article has failed.
The attempt to plot a graph for these metrics has failed.
Coordinated scheduling of electricity and natural gas infrastructures with a transient model for natural gas flow
Rent:
Rent this article for
USD
10.1063/1.3600761
/content/aip/journal/chaos/21/2/10.1063/1.3600761
http://aip.metastore.ingenta.com/content/aip/journal/chaos/21/2/10.1063/1.3600761

Figures

Image of FIG. 1.
FIG. 1.

Coordination scheme for electric power and natural gas infrastructures.

Image of FIG. 2.
FIG. 2.

Flowchart for the coordination of ISO and natural gas operator.

Image of FIG. 3.
FIG. 3.

Grid points in the finite difference scheme.

Image of FIG. 4.
FIG. 4.

118-bus power system.

Image of FIG. 5.
FIG. 5.

Interstate pipeline.

Image of FIG. 6.
FIG. 6.

Hourly natural gas and electricity load.

Image of FIG. 7.
FIG. 7.

Hourly natural gas delivered to power plants in cases 1–3.

Image of FIG. 8.
FIG. 8.

Hourly natural gas well output in cases 1–3.

Image of FIG. 9.
FIG. 9.

Hourly natural gas consumed by compressor in cases 1–3.

Image of FIG. 10.
FIG. 10.

Pressure at starting and ending points of the pipeline in case 2.

Image of FIG. 11.
FIG. 11.

Hourly pressure at starting/ending points of pipeline in case 3.

Tables

Generic image for table
Table I.

Natural gas transportation and supply contracts.

Generic image for table
Table II.

Parameters of interstate pipeline.

Generic image for table
Table III.

Parameters of compressor and natural gas well.

Generic image for table
Table IV.

Unit commitment in case 1.

Generic image for table
Table V.

Daily scheduling coordination results in cases 1–3.

Generic image for table
Table VI.

Initial parameters of interstate pipeline.

Generic image for table
Table VII.

Unit commitment in case 2.

Loading

Article metrics loading...

/content/aip/journal/chaos/21/2/10.1063/1.3600761
2011-06-28
2014-04-16
Loading

Full text loading...

This is a required field
Please enter a valid email address
752b84549af89a08dbdd7fdb8b9568b5 journal.articlezxybnytfddd
Scitation: Coordinated scheduling of electricity and natural gas infrastructures with a transient model for natural gas flow
http://aip.metastore.ingenta.com/content/aip/journal/chaos/21/2/10.1063/1.3600761
10.1063/1.3600761
SEARCH_EXPAND_ITEM