1887
banner image
No data available.
Please log in to see this content.
You have no subscription access to this content.
No metrics data to plot.
The attempt to load metrics for this article has failed.
The attempt to plot a graph for these metrics has failed.
Optimized working conditions for a thermoelectric generator as a topping cycle for gas turbines
Rent:
Rent this article for
USD
10.1063/1.4757008
/content/aip/journal/jap/112/7/10.1063/1.4757008
http://aip.metastore.ingenta.com/content/aip/journal/jap/112/7/10.1063/1.4757008

Figures

Image of FIG. 1.
FIG. 1.

(a) Schematic of Brayton cycle with regenerator and TEG topping cycle and (b) corresponding T-s diagram.

Image of FIG. 2.
FIG. 2.

(a) Schematic of Brayton cycle with TEG preheating topping cycle and (b) corresponding T-s diagram.

Image of FIG. 3.
FIG. 3.

Efficiency comparison of Brayton cycle with TEG topping cycle and regenerator.

Image of FIG. 4.
FIG. 4.

Relative efficiency improvement of the combined cycle with TEG topping cycle and regenerator over simple Brayton cycle.

Image of FIG. 5.
FIG. 5.

Relative efficiency improvement of the combined cycle with TEG preheating cycle over simple Brayton cycle.

Image of FIG. 6.
FIG. 6.

Possible design for TEG preheating topping cycle with Brayton gas turbine.

Tables

Generic image for table
Table I.

Parameters used for computational model.

Loading

Article metrics loading...

/content/aip/journal/jap/112/7/10.1063/1.4757008
2012-10-05
2014-04-20
Loading

Full text loading...

This is a required field
Please enter a valid email address
752b84549af89a08dbdd7fdb8b9568b5 journal.articlezxybnytfddd
Scitation: Optimized working conditions for a thermoelectric generator as a topping cycle for gas turbines
http://aip.metastore.ingenta.com/content/aip/journal/jap/112/7/10.1063/1.4757008
10.1063/1.4757008
SEARCH_EXPAND_ITEM