1887
banner image
No data available.
Please log in to see this content.
You have no subscription access to this content.
No metrics data to plot.
The attempt to load metrics for this article has failed.
The attempt to plot a graph for these metrics has failed.
A stochastic programming approach for optimal microgrid economic operation under uncertainty using 2m + 1 point estimate method
Rent:
Rent this article for
USD
10.1063/1.4808039
/content/aip/journal/jrse/5/3/10.1063/1.4808039
http://aip.metastore.ingenta.com/content/aip/journal/jrse/5/3/10.1063/1.4808039

Figures

Image of FIG. 1.
FIG. 1.

Pseudocode of the 2m + 1 scheme.

Image of FIG. 2.
FIG. 2.

A typical LV microgrid model.

Image of FIG. 3.
FIG. 3.

Forecasted values for market energy prices, load demand, output power of WT and PV.

Image of FIG. 4.
FIG. 4.

Probability density function and cumulative density function of expected cost for scenario 1.

Image of FIG. 5.
FIG. 5.

Probability density function and cumulative density function of expected cost for scenario 2.

Image of FIG. 6.
FIG. 6.

Seven-step approximation of the normal distribution.

Tables

Generic image for table
Table I.

The bids and limits of the installed DG sources.

Generic image for table
Table II.

Comparison of results in the case of cost objective and simulation time for first scenario out of 50 trials.

Generic image for table
Table III.

Comparison of results in the case of cost objective and simulation time for the second scenario out of 50 trials.

Generic image for table
Table IV.

Best solutions obtained deterministic economic dispatch using SBSO3 algorithm (first scenario).

Generic image for table
Table V.

Best solutions obtained deterministic economic dispatch using SBSO3 algorithm (second scenario).

Generic image for table
Table VI.

Effects of the proposed modifications on values of the first moment of probabilistic energy operation management for scenarios 1 and 2 (50 runs).

Generic image for table
Table VII.

Best solutions obtained probabilistic economic dispatch using SBSO3 algorithm (first scenario).

Loading

Article metrics loading...

/content/aip/journal/jrse/5/3/10.1063/1.4808039
2013-05-28
2014-04-17
Loading

Full text loading...

This is a required field
Please enter a valid email address
752b84549af89a08dbdd7fdb8b9568b5 journal.articlezxybnytfddd
Scitation: A stochastic programming approach for optimal microgrid economic operation under uncertainty using 2m + 1 point estimate method
http://aip.metastore.ingenta.com/content/aip/journal/jrse/5/3/10.1063/1.4808039
10.1063/1.4808039
SEARCH_EXPAND_ITEM