Previous Article
Building Constructive Innovation Networks: Role of Relationship Management
In response to the growing demands for innovation, networked arrangements that draw together and synthesize the knowledge resources of multiple organizations and sectors have come to the fore-front wi...
Next Article
Using Bargaining-Game Theory for Negotiating Concession Period for BOT-Type Contract
This paper extends the build-operate-transfer (BOT) concession model (BOTCcM) to a new method for identifying a concession period by using bargaining-game theory. Concession period is one of the most ...

You are not logged in. Log in

Download the ASCE Research Library NOW! widget and search our comprehensive catalogue of civil engineering resources right from your desktop

Lean Management Model for Construction of High-Rise Apartment Buildings

J. Constr. Engrg. and Mgmt. Volume 133, Issue 5, pp. 374-384 (May 2007)

Issue Date: May 2007
Buy This Article   (US$30)
Download PDF (675 kB) View Cart
R. Sacks1 and M. Goldin2
1Senior Lecturer, Faculty of Civil and Environmental Engineering, Technion-Israel Institute of Technology, Haifa 32000, Israel. E-mail: cvsacks@techunix.technion.ac.il
2Graduate Student, Faculty of Civil and Environmental Engineering, Technion-Israel Institute of Technology, Haifa 32000, Israel. E-mail: goldm@techunix.technion.ac.il

Execution of the finishing works in high-rise apartment buildings is made complex by the need to customize apartments to the varying requirements and designs of individual clients. The conventional construction planning practice of progressing upward from floor to floor breaks down in the face of the arbitrary sequence in which clients finalize their decisions. The results are long cycle times for delivery of completed apartments and corollary high levels of work in progress, budget and schedule overruns, and general dissatisfaction with the process on the part of the developer, contractor, subcontractors, and the clients. Application of lean construction principles to this problem has led to development of a management model that adopts pull scheduling, reduced batch sizes, and a degree of multiskilling. The main benefits expected are an enhanced ability to provide customized apartments, improved cash flow, and reduced apartment delivery cycle times. The model was first formulated in theory, then tested using a management simulation game and computer simulation, and subsequently, developed for practical application. This paper presents an analysis of conventional practice, the theoretical background to the lean approach, and the specific management changes proposed.

©2007 ASCE
History: Submitted 8 July 2005; accepted 30 November 2006
Permalink: http://dx.doi.org/10.1061/(ASCE)0733-9364(2007)133:5(374)

RELATED DATABASES


To view database links for this article,
you need to log in.
To view database links for this article,
you need to log in.

PUBLICATION DATA

ISSN:
1943-7862 (online)   0733-9364 (print)
Publisher:
AIP is a member of CrossRef ASCE

REFERENCES (28)

For access to fully linked references, you need to log in. For access to fully linked references, you need to Log in.

CITING ARTICLES

For access to citing articles, you need to log in.
For access to citing articles, you need to Log in.

 
©  American Society of Civil Engineers